2026-42: Beacon Repair Works – River Stour

12 May 2026

Mariners are advised that from 14 – 30 May 2026, navigation beacon repair works will be taking place in the River Stour in the following locations:

Beacon Name Latitude Longitude
Holbrook Beacon 51o 57.219’ N 001o 10.355’ E
No. 2 Beacon 51o 57.030’ N 001o 10.215’ E
No. 6 Beacon 51o 56.979’ N 001o 07.875’ E

See the PDF version below for location diagram.

These works will involve the cleaning, repairing and re-painting of the navigation beacons by workboat Jean T (Callsign: MVS06) and pontoon PFL100.

Mariners are advised to navigation with caution in these areas and requested to pass at slow speed.

Download the PDF version