2026-48: Beacon Repair Works – River Stour (update 1)
01 June 2026
Navigation beacon repair works taking place in the River Stour in the following locations will now continue until approximately 07 June 2026:
| Beacon Name | Latitude | Longitude |
| Holbrook Beacon | 51o 57.219’ N | 001o 10.355’ E |
| No. 2 Beacon | 51o 57.030’ N | 001o 10.215’ E |
| No. 6 Beacon | 51o 56.979’ N | 001o 07.875’ E |
These works will involve the cleaning, repairing and re-painting of the navigation beacons by workboat Jean T (Callsign: MVS06) and pontoon PFL100.
Mariners are advised to navigation with caution in these areas and requested to pass at slow speed.
This local notice to mariners replaces 2026-42, which is now withdrawn.
