16-2019: Maintenance dredging – Water injection dredging

Mariners are advised that on or about the 18th March 2019 the dredger Borr will commence maintenance dredging, generally over high water periods, in the following locations:
• Navigation House jetty,
• Shotley Marina Channel,
• Halfpenny pier,
• Harwich lifeboat berth,
• Fishermen’s moorings area west of Trinity House pier,
• Trinity House pier and the
• Mistley berths and channel
• Harwich Navyard
• Harwich International Port

for a period of approximately 10 days.
Detailed dredger movements can be obtained from Harwich VTS on VHF Channel 71.
Lights and shapes as required by Collision Regulations will be exhibited and a listening watch on VHF Channel 71 will be maintained throughout.

Download the PDF version