03-2025: Dredging Operations – Cathy Anne

08 January 2025

Mariners are advised that the Cathy Anne will be carrying out water injection dredging operations at Mistley and in the upper River Stour on or around the following dates:

  • 13 to 19 January 2025
  • 10 to 16 February 2025
  • 10 to 16 March 2025
  • 09 to 17 April 2025
  • 12 to 19 May 2025
  • 07 to 13 June 2025
  • 07 to 14 July 2025
  • 06 to 12 August 2025

Download the PDF version