21 -2018: Maintenance Dredging

Mariners are advised that on or about the 29th April 2018 the trailer suction dredger UILENSPIEGEL will commence maintenance dredging of the Harwich Haven berths and Approaches for a period of approximately 7 days.

Material from these areas will be disposed to the Inner Gabbard disposal site.

 

Detailed dredger movements can be obtained from Harwich VTS on VHF Channel 71.

Lights and shapes as required by Collision Regulations will be exhibited and a listening watch on VHF Channel 71 will be maintained throughout.

download pdf version